Racing Daughter Heart Ladies’ Essential Dri-Power Long Sleeve Tee

$34.99
$34.99
Shipping calculated at checkout.
Color Black
Size

Description

This Racing Daughter Heart Essential Dri-Power Long Sleeve Tee will keep you dry and looking great. This shirt is constructed with Dri-Power Moisture Wicking Technology and Odor prevention, and it is made from a blend of 60% cotton and 40% polyester (47% cotton and 53% polyester for Oxford). You'll be protected from the sun's UV rays thanks to the UPF 30+ rating. The lower left front of the shirt contains a heat-sealed RUSSELL ATHLETIC label, and the fit is tailored for a woman's body. It's the perfect way to cheer on your daughter's racing team and express your support for her. DIGISOFTTM is the print process used.

Size Chart

 

IMPORTANT ABOUT OUR APPAREL SIZES!

T-shirts:

For the Bellas and Next Levels t-shirts, we would recommend you to size up one size as those are more fitted tees.​ Districts, Gildans, and American apparel are pretty accurate sizes as well as our hoodies

AOP Hoodie:

Our AOP print hoodies run a bit small for our USA customers, we suggest measuring your chest width and then referring to the nearest available size in our sizing chart.

Sherpa Jackets.

These are pretty accurate sizes, even though we recommend you check the size chart first.

Bomber Jackets

According to some of our previous customers these jackets run a bit small, so we recommend you to size up.

SHIPPING TIME

Ornaments/Embroidered Hats/Knit caps/Duffel bags/Coolers.

Production Time Estimate
1.5 to 4 business days
Shipping Time Estimate
4 to 8 business days for US orders

Custom Led lamps:

3-6 business days
Shipping Time Estimate
10 to 17 business days.

T-shirts/Necklaces/Christmas Stockings:

Production Time Estimate
2.8 to 6 business days

Shipping Time Estimate
5 to 12 business days for US orders

Shipping Time Estimate
2 to 4 weeks for international orders

AOP products such (as rugs, blankets, travel bags, AOP hoodies/dresses, pillows, metal signs, and shower curtains...)
Production Time Estimate
6 to 13 business days

Shipping Time Estimate
1 to 3 Weeks

Total Delivery Time Estimate
2 to 4 Weeks

Our famous sherpa jackets:

These are in super high demand:

Production Time Estimate
4 to 8 business days

Shipping Time Estimate
2 to 3 Weeks

Should you have any questions or concerns please contact us via the live chat or send us an EMAIL.